Lighting upgrade planning compares a replacement proposal with the actual existing installation. Start here when poles, cabling, mounting interfaces or operating schedules may need to remain. Record the present conditions and intended outcome; any claimed performance or energy improvement requires project-specific evidence.
LUXiFiC / Solutions / Lighting upgrade planning
Lighting upgrade planning compares a replacement proposal with the actual existing installation. Start here when poles, cabling, mounting interfaces or operating schedules may need to remain. Record the present conditions and intended outcome; any claimed performance or energy improvement requires project-specific evidence.Page content updated
Decision sequence
Use the same brief to move from the first requirement to a focused technical response.
A lighting upgrade brief is a record of what will change and what must remain. Describe the current luminaires, mounting conditions, area geometry and operating schedule, then state the target outcome. Identify installation constraints and required continuity before comparing replacements; energy or performance improvements need project-specific evidence.
Record the existing conditions, define the new requirement, compare product families, and flag any site information that still needs confirmation.
The public site focuses on the review process and the available product and testing context. Project outcomes require project-specific evidence.
Scope
A lighting upgrade brief is a record of what will change and what must remain. Describe the current luminaires, mounting conditions, area geometry and operating schedule, then state the target outcome. Identify installation constraints and required continuity before comparing replacements; energy or performance improvements need project-specific evidence.
Workflow
Record the existing conditions, define the new requirement, compare product families, and flag any site information that still needs confirmation.
Evidence
The public site focuses on the review process and the available product and testing context. Project outcomes require project-specific evidence.
Lighting upgrades
Upgrades are easier to review when the current installation, intended improvement, replacement boundary and document needs are written down together.
Record the current fixture role, mounting, spacing, operating context and the reason for change before proposing a replacement family.
The purpose is to make the change measurable in the brief without inventing savings, performance or delivery outcomes.

Describe the current installation, access constraints, visual issues and information available from the site.

State whether the priority is replacement, maintenance access, visual quality, controls, resilience or another project goal.

Request the model-specific drawings, optical data and compatibility checks needed before procurement.
Without a confirmed baseline, a public page cannot promise energy savings, payback, compatibility or a final quantity.
Separate recorded site information from assumptions that still need a survey or project document.
Identify mounting, electrical, control and maintenance questions for the selected model.
Agree what must be confirmed before the project moves from shortlist to quotation.
No. A saving calculation requires reliable existing and proposed configuration data, operating assumptions and project-specific review.
Include current fixture information, site or mounting details, the intended improvement, approximate quantity and the target market.
Make the upgrade question reviewable.